게시판

OEM / ODM Partnership

OEM process

OEM process

  • inquiry

  • counseling

  • contract

  • Development

  • warehousing

  • manufacture

  • delivery

ODM process

Contact us

Hadong - Head Office
(Production, R&D)

  • 50-1 Ipseok-gil, Agyang-Myeon, Hadong-Gun, Gyeongsangnam-Do 667-813, Republic of Korea

  • +82 70.4656.0891
  • +82 55.722.7225
  • jadeleetea.korea@gmail.com

Gyeonggi Office
(International Sales & Distribution)

  • F3 144, Sicheong-ro, Gwangmyeong-si, Gyeonggi-do, 14226, Republic of Korea

  • +82 10.9005.8433
  • +82 2.2688.3015
  • jadelee.kai@gmail.com

상단내용 입력 영역

The Ultimate Guide to Installing a 3-Phase UPS System

Millie
2025.10.09 02:30 14 0

본문

:

Installing a three-phase UPS system requires meticulous preparation and خرید یو پی اس strict compliance with electrical codes. Before beginning the installation, verify your site supports a three-phase input and the unit’s power rating aligns with your critical loads. Carefully study the official installation guide as variations between models demand tailored procedures.


Ensure the installation area is well ventilated and free from dust, moisture, and extreme temperatures. Mount the unit on a rigid, vibration-resistant platform that can bear its maximum load. Maintain adequate clearance around the unit for airflow and maintenance access.


Turn off and lock out all upstream power sources before starting. Verify that there is no residual voltage using a properly rated multimeter. Connect the three-phase input cables according to the labeled terminals on the UPS. Standard labeling includes R, S, T for phases and N for neutral. Bond the grounding wire to a certified grounding electrode with appropriately sized conductor.


Attach the load wiring to the designated output terminals. Make sure the load is balanced across all three phases as much as possible to avoid overloading any one phase. Use appropriately sized circuit breakers and fuses in the distribution panel to protect both the UPS and the connected equipment.


Once wiring is completed and double-checked, conduct a thorough physical check of connections. Check for loose terminals, exposed conductors, or damaged insulation. If no anomalies are detected, power up incrementally and observe the unit’s status indicators.


Initiate a test run by switching the UPS to battery mode and confirming that it powers the connected equipment without interruption. Verify the state of charge and health indicators. Simulate maximum operational demand to validate capacity.


Maintain a comprehensive installation dossier with wire gauges, breaker specs, and settings. Provide training to facility staff on basic operation and routine maintenance such as checking battery health and cleaning air filters. Arrange bi-annual certified service visits.


Never attempt to modify the internal components of the UPS or bypass safety features. If in doubt at any point, consult a licensed electrician or the manufacturer’s technical support team. Adhering to best practices extends equipment life and protects critical operations.

댓글목록 0

등록된 댓글이 없습니다.
image

Good Energy, Good People.

아시아 No.1을 넘어 세계를 향하는
Leading Company

  • 01

    에너지 펀드 가입 방법

    저희 기업에서는 에너지 펀드를 받고 있습니다.
    환경과 에너지를 생각하시는 분들을 모십니다.

  • 02

    사회공헌

    저희 기업에서는 사회공헌에 노력하고 있습니다.
    보다 좋은 세상을 위해 노력하는 기업이 되겠습니다.

  • 03

    교육 기관 견학 신청

    저희 기업에서는 교육기관 및 단체의 견학 신청을 받습니다.
    에너지의 생산과 활용 및 발전에 대해 견학해 보시기 바랍니다.

  • 04

    오시는 길

    서울특별시 목동서로 5200 하이퍼그룹 23층
    [전화번호] 02.1234.1234
    [팩스] 02.3434.3434